Dock Leveler Pit Form, for Loading Dock Concrete Pour

Dock Leveler Pit Form, for Loading Dock Concrete Pour

Skip to product information
1 of 1

* Product images may appear with optional features or accessories.

$1,287.20 USD

High Quality Products

Standard Shipping Included
*exclusions apply

Availability

Usually ships in 4 weeks. Ships via Motor Freight.

View full details

Product details

The dock leveler pit form is used for pouring concrete at a loading dock for dock leveler installation. The pit form is manufactured to fit your brand of dock leveler, and makes forming the pit simple! The form uses welded strapping and rebar, resulting in a strong embed for your leveler. The exposed surface is finished with gray primer. Includes 3” x 3” x 3/16” angle at top edge of side and back walls.

REINFORCED WALLS

12 GA steel sides are reinforced with 1” x 1” vertical angles, a vertical 1” x 2” x 1/8” angle at the back and a 3/16” plate at the front for attaching the dock bumpers, and 3” x 6” x 12 GA concrete anchors.

FRONT CURB ANGLE

The front curb angle is a 3” x 3” x 3/16”angle with 3” x 6” x 5/8” rebar anchors.

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Why Planned Maintenance Matters

Much like your automobile, planned preventive maintenance can extend the life of your facility assets and assist in the prevention of costly unexpected repairs, equipment down time, and possible injury to your personnel

Learn more